In short
The ERE per kWh conversion factor indicates how many EREs one charged kilowatt-hour yields. For electricity from the grid, this is just over 0.33 ERE per kWh; only electricity renewably generated at the charging location itself or supplied via a direct line yields double. The NEa determines the factor annually.
How the NEa calculates from kWh to ERE
The formula comes from RED III: number of ERE = kWh × renewable share × 183 g CO2 per MJ × 3.6 MJ per kWh ÷ 1,000. The 183 grams is the fossil reference, the emissions you avoid; 3.6 converts kilowatt-hours to megajoules. With the fixed renewable share of 50.5% for 2026, this becomes 1 × 0.505 × 183 × 3.6 ÷ 1,000 = 0.3327 ERE. With 100% renewable, it becomes 0.6588.
- Home charger, grid electricity (even with solar panels or green contract): renewable share 50.5%, 0.3327 ERE per kWh (2026).
- Business charging point, electricity generated on-site or via direct line, with Guarantees of Origin (GoOs): 100%, 0.6588 ERE per kWh.
What that is in euros
With an accounting value of €0.45 per ERE (23 September 2026), a charged kWh is worth approximately €0.15 gross. Selling costs and commission will still be deducted from this. The current value is on the ERE price page; the comparator calculates what your charging volume yields net per provider.
Frequently asked questions about ERE per kWh
Do I get more EREs with solar panels?
No. For a private connection, the NEa always uses the fixed renewable share for that year, 50.5% in 2026.
Does the conversion factor change?
Yes, every year. The renewable share of the grid mix is determined annually and increases as the grid becomes greener.
Related terms
- ERE (Emission Reduction Units)
- HBE (Renewable Fuel Units)
- Booking service provider (booker)
- NEa (Dutch Emissions Authority)
- Emissions market (ERE)
- Fuel Transition Obligation (BTV)
- Booking-in
- Double booking
- RED III
- REV (Register for Energy for Transport)
- NEa audit
- GoO (Guarantee of Origin)
- Subsidy (ERE)
- Emission Allowances (ETS)
- Renewable share
- Fuel Supplier
- Annual Obligation for Energy in Transport
- Private and business
- Home Charger
- Entitled party (ERE)
- Owners' Association (VvE)
- Authorisation (ERE)
- NEa list (list of booking service providers)
- Reseller (ERE)
- Verifier (ERE)
- Booking deadline (1 March)
What does your charge point earn?
Compare the booking service providers on commission, service costs, payout and contract term.
Go to the comparison