In short
An exclusive allocation point is a split from a grid connection, made by the grid operator, behind which only the charging station consumes, with its own MID-certified meter. It is the only situation in which the NEa allows a charging station without its own built-in MID meter to be registered.
When an allocation point offers a solution
In its help document for private individuals, the NEa names the exclusively metered allocation point as the only exception to the requirement for a MID meter in the charging station. The idea: if only charging occurs behind a measurement from the grid operator, that measurement is equally reliable. This occurs with a separate connection for a fleet of vehicles or a public charging point. In a home, where the charging station is behind the same meter as the refrigerator, it rarely applies; requesting an extra allocation point from the grid operator costs money and time, and a new charging station with a built-in MID meter is usually quicker and cheaper. Ask your registration service provider if your situation is suitable.
Related terms
What does your charge point earn?
Compare the booking service providers on commission, service costs, payout and contract term.
Go to the comparison