Back to the provider overview
Grid Gain

Grid Gain

About us

Auto-filled profile (draft)

Grid Gain presents itself as an ERE partner with quarterly payout to your own bank account. Important to know: the provider does not publish current rates. Concrete commission percentages and an annual audit fee for business locations circulated earlier, but those figures cannot be found on its own site and have therefore been removed from the comparison. Cancellation is also only possible towards the end of the calendar year, and extra market costs may be withheld in the ERE trade. Request current terms and the full cost picture directly before signing.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Status on ERE-Vergelijk

Grid Gain was on the final list of booking service providers the NEa published (version of 7 Aug 2026) and is included in our provider overview. The NEa has not published a list since October 2026.

Not in the comparison

The NEa register is broader than our comparison: it also holds parties that only book fuels or have no offering for charge-point owners. No offering from Grid Gain is in our comparison yet.

Do you work at Grid Gain? Submit your offering through the provider portal and we will add it after review. To the provider portal

Pros and points to consider

Pros

  • Also without a smart charger

Points to consider

  • Terms not yet checked by us
  • No KvK number known

What you need to know

We have not checked the terms of Grid Gain yet.

Payout
Quarterly
Not needed (favourable)

Contact

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs. Whether your charging station must also be connected (OCPP, app or cloud) is up to the provider: the NEa only requires that the link with your charging station can be demonstrated — a photo of just a kWh reading is not enough.

A MID meter built into the charging station is mandatory

For ERE registration a MID meter built into the charging station is mandatory (NEa). The MID meter provides an accurate, legally valid record of the charged volume; without a MID meter the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.