Back to the provider overview
Even Laden

Even Laden

About us

Auto-filled profile (draft)

Even Laden from Hendrik-Ido-Ambacht, part of Symfon-e, makes the ERE scheme accessible to private users, companies and homeowner associations, with a clear explanation on the website and help with the suitability check and charge-point registration. The split is 75% for the customer and 25% commission. Any service costs are not published and the term and payout frequency are also not stated — ask about these before comparing. Participation requires a charge point with a built-in MID meter.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Status on ERE-Vergelijk

Even Laden was on the final list of booking service providers the NEa published (version of 7 Aug 2026) and is included in our provider overview. The NEa has not published a list since October 2026.

Not in the comparison

The NEa register is broader than our comparison: it also holds parties that only book fuels or have no offering for charge-point owners. No offering from Even Laden is in our comparison yet.

Do you work at Even Laden? Submit your offering through the provider portal and we will add it after review. To the provider portal

Pros and points to consider

Pros

  • None

Points to consider

  • Terms not yet checked by us
  • Not checked whether a smart charger is needed
  • No KvK number known

What you need to know

We have not checked the terms of Even Laden yet.

Payout
Not checked
Not checked
Price model
ERE market price minus the provider's commission

Contact

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs. Whether your charging station must also be connected (OCPP, app or cloud) is up to the provider: the NEa only requires that the link with your charging station can be demonstrated — a photo of just a kWh reading is not enough.

A MID meter built into the charging station is mandatory

For ERE registration a MID meter built into the charging station is mandatory (NEa). The MID meter provides an accurate, legally valid record of the charged volume; without a MID meter the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.