Back to the provider overview
Laadnet

Laadnet

Individual

About us

Auto-filled profile (draft)

Laadnet uses a clear split model for private users: the customer keeps 80% of the ERE proceeds, Laadnet 20%. There are no subscription or registration fees; only guest-charging settlement carries a separate rate of €0.35 per transaction. There is a choice of flexible and annual contracts with a mandate of at least twelve months, and a user portal shows charged kWh and accumulated EREs. Payout is quarterly; the first payment covering charging year 2026 follows in the first quarter of 2027. Participation requires a charging station connected via the Laadnet cloud with MID-certified metering. The service targets smaller volumes.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Contracts

Individual

Net per year*€292
Commission
20%Medium
Duration1 year
PayoutQuarterly
Yes
Service costsNone

What does this earn?

A worked example at 2,500 kWh charged per year. That is roughly 832 ERE, at the calculation value of €0.45 per ERE this site uses everywhere.

832 ERE × €0.45€370.13
Market costs (1.5%)− €5.55
This provider’s commission (20%)− €72.92
Net per year€291.66

An estimate, not an offer: what you earn depends on your consumption, your meter readings and the price at the time of payout. The price used is published with its reference date and source on ERE price

Calculate with your own consumption

What you need to know

The terms the comparison does not show. Only what is known appears here.

Notice period
1 month (Opzeggen kan schriftelijk, uiterlijk één maand vóór het einde van het kalenderjaar.)
After the term ends
Renews automatically for one year at a time
Price model
ERE market price minus the provider's commission
First payout
Other: De ERE-certificaten over 2026 worden in het eerste kwartaal van 2027 verkocht.

Checked by our editors on 23 Sept 2026.

Pros and points to consider

Pros

  • You keep 80% of the ERE proceeds
  • Choice of flexible and annual contracts
  • User portal with kWh insight

Points to consider

  • Monthly service fees on a fixed contract
  • Annual payout takes a long time
  • Limited to smaller volumes

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs.

A MID meter is almost always required

Regardless of whether the charger is smart or not, an MID-certified meter is almost always required for ERE. The MID meter provides an accurate, legally valid record of the charged volume. Without an MID meter, the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.