Back to the provider overview
KE

Kemp-Groep

About us

Auto-filled profile (draft)

Kemp-Groep specialises in electric earthmoving and construction equipment, with a national network of branches and its own rental arm, and is registered with the NEa as an ERE service provider. That makes the company relevant for the construction sector, where electric machinery and site charge points can also generate EREs. However, public ERE information is missing: commission and payout are not transparent and online sign-up is not possible. Construction companies working with Kemp can ask directly about the options.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Status on ERE-Vergelijk

Kemp-Groep is on the NEa list of booking service providers (version of 7 Aug 2026) and is included in our provider overview.

Not in the comparison

The NEa register is broader than our comparison: it also holds parties that only book fuels or have no offering for charge-point owners. No offering from Kemp-Groep is in our comparison yet.

Do you work at Kemp-Groep? Submit your offering through the provider portal and we will add it after review. To the provider portal

Pros and points to consider

Pros

  • Registered with the NEa as a filing service provider
  • Specialist in electric earthmoving and construction equipment
  • Nationwide network of branches and its own rental arm

Points to consider

  • No public ERE information on the website
  • Commission and payout not transparent
  • No online sign-up option for ERE registration

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs.

A MID meter is almost always required

Regardless of whether the charger is smart or not, an MID-certified meter is almost always required for ERE. The MID meter provides an accurate, legally valid record of the charged volume. Without an MID meter, the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.