Back to the provider overview
Grid Gain BV

Grid Gain BV

About us

Auto-filled profile (draft)

Grid Gain presents itself as an ERE partner with quarterly payout to your own bank account. Important to know: the provider does not publish current rates. Concrete commission percentages and an annual audit fee for business locations circulated earlier, but those figures cannot be found on its own site and have therefore been removed from the comparison. Cancellation is also only possible towards the end of the calendar year, and extra market costs may be withheld in the ERE trade. Request current terms and the full cost picture directly before signing.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Status on ERE-Vergelijk

Grid Gain BV is on the NEa list of booking service providers (version of 7 Aug 2026) and is included in our provider overview.

Not in the comparison

The NEa register is broader than our comparison: it also holds parties that only book fuels or have no offering for charge-point owners. No offering from Grid Gain BV is in our comparison yet.

Do you work at Grid Gain BV? Submit your offering through the provider portal and we will add it after review. To the provider portal

What you need to know

Payout frequency
Quarterly
No

Pros and points to consider

Pros

  • Registered with the NEa as a filing service provider
  • Audit-ready administration and registration of connections
  • Processes around 2.4 million certificates per year

Points to consider

  • No commission or rates for ERE public
  • No consumer offering, only large business consumers
  • Payout frequency and contract term not stated

Contact

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs.

A MID meter is almost always required

Regardless of whether the charger is smart or not, an MID-certified meter is almost always required for ERE. The MID meter provides an accurate, legally valid record of the charged volume. Without an MID meter, the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.