Back to the provider overview
Eneco eMobility B.V.

Eneco eMobility B.V.

About us

Auto-filled profile (draft)

Eneco eMobility offers both private and business customers the option to monetise the ERE value of their charging volume, with direct online sign-up. The provider mentions an indicative ERE value of up to around 10 cents per kWh, but the commission split is not disclosed — it is set per contract. Payout frequency and term are also not stated. Participation requires a charge point with a MID meter that can be read remotely. Eneco's scale and brand recognition are a plus; the limited rate transparency calls for thorough questioning before signing.

This text was compiled in July 2026 from public information published by the provider. Something not right? Update it in the provider portal.

Status on ERE-Vergelijk

Eneco eMobility B.V. is on the NEa list of booking service providers (version of 7 Aug 2026) and is included in our provider overview.

Not in the comparison

The NEa register is broader than our comparison: it also holds parties that only book fuels or have no offering for charge-point owners. No offering from Eneco eMobility B.V. is in our comparison yet.

Do you work at Eneco eMobility B.V.? Submit your offering through the provider portal and we will add it after review. To the provider portal

What you need to know

Yes

Pros and points to consider

Pros

  • ERE offering for both consumers and businesses
  • Indicative ERE value of up to around 10 cents per kWh
  • Sign up online straight away

Points to consider

  • Commission split not public, set per contract
  • MID meter required to take part
  • Payout frequency and contract term not stated

Smart charger & MID meter

What is a smart charger?

A smart charger is a charging station that is connected to the internet and can automatically record and report your charging sessions to the provider. This lets the provider see exactly how many kWh were charged and when, and — for some services — steer the charging moment to take advantage of green electricity or lower tariffs.

A MID meter is almost always required

Regardless of whether the charger is smart or not, an MID-certified meter is almost always required for ERE. The MID meter provides an accurate, legally valid record of the charged volume. Without an MID meter, the kWh cannot be converted into ERE units. The only exception the NEa names is an exclusive allocation point set up by your grid operator, behind which only the charger draws power — rare for home chargers.