Two
MIDYesSmartYes
Charging post with two charge points (up to 22 kW per socket). Per the Powerstation technical sheet it has two MID-certified kWh meters and connects via Ethernet or 4G with OCPP 1.6J.
Charge-point brand
Our register lists 1 charge point from Powerstation, with a built-in MID meter.
Charging post with two charge points (up to 22 kW per socket). Per the Powerstation technical sheet it has two MID-certified kWh meters and connects via Ethernet or 4G with OCPP 1.6J.
Not sure which model you have, or does it depend on the version? The MID check takes you through it in a few steps.
Go to the MID checkDoes your charge point have a built-in MID meter? Then an ERE provider can pay you for every kWh you charge. Compare what the providers pay.
Go to the comparisonThis check is informational and based on public manufacturer specifications. For 100% certainty, inspect the type plate (green M-logo + EN 50470-3) or ask your registration provider.