Mennekes logo

Charge-point brand

Mennekes charge points

Our register lists 12 charge points from Mennekes: 2 with a built-in MID meter, 5 where it depends on the version and 5 without a MID meter.

About Mennekes

MENNEKES Elektrotechnik is a German manufacturer based in Kirchhundem (Sauerland), founded in 1935 and family-owned for more than 80 years. It makes plugs and sockets and charging solutions for electric vehicles: AMTRON wallboxes for home and business use, and AMEDIO charging stations.

Company
MENNEKES Elektrotechnik GmbH & Co. KG
Country
Germany
City
Kirchhundem
Founded
1935

Service and app

App
AMTRON 4Drivers
Charging data
The AMTRON 4Drivers app can, among other things, export statistics; wallboxes with OCPP, such as the AMTRON Professional, send their data to any OCPP-based backend.

Models

12 models

Dynamic load balancing and solar charging often need a separate meter, sensor or licence.

Mennekes Amtron Professional / Twincharge

Amtron Professional / Twincharge

MIDYesSmartYes

Built-in MID-certified kWh meter, side-readable. Per Mennekes this applies to the whole Professional series, including the Professional+ with built-in modem.

Charging power
22 kW
Phases
single- or three-phase
Connector
tethered cable or type 2 socket
Connectivity
Ethernet
OCPP
1.5, 1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
home, businesses, public charging
Availability
in the current range
Mennekes Amtron 4You 400 / 560

Amtron 4You 400 / 560

MIDVariantSmartYes

How to recognise the MID version

Not every version of this model has the MID meter. Check the type plate, the quote or the invoice to see which version you have, or ask your point of sale or installer.

Our register lists this model's versions on separate rows: check which row matches your type plate.

For this model

Mind the model numbers: within the 4You family only the 4You 460 and 4You 560 have a built-in, externally readable MID meter, and per Mennekes it is MID-compliant only on a three-phase connection. The 4You 410 and 510 have no MID meter. Check the model number on the type plate (460 or 560) and whether your charger is connected three-phase.

The MID marking

On the kWh meter or its type plate, right after the CE marking, look for a capital M with the last two digits of the year in which the marking was affixed, together inside a rectangle, followed by the identification number of the notified body. That is the supplementary metrology marking the European Measuring Instruments Directive (MID, 2014/32/EU) prescribes.

Example of a type plate with the CE marking and the MID markingNext to the CE marking stands a rectangle with an M and the last two digits of the year, followed by the number of the notified body.Example type plateCE260000MetrologymarkingM26 = MID marking
Charging power
11 kW
Phases
single- or three-phase
Connectivity
Wi-Fi
OCPP
1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
home
Mennekes Amtron 4You 410 / 510

Amtron 4You 410 / 510

MIDNoSmartYes

The AMTRON 4You 410 and 510 have no MID-certified kWh meter — not ERE-eligible. The versions with a MID meter are the 4You 460 and 560. In doubt? Check the model number on the type plate.

Charging power
11 kW
Phases
single- or three-phase
Connector
tethered cable
Connectivity
Wi-Fi
OCPP
1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
home
Mennekes Amtron 4Business 700

Amtron 4Business 700

MIDVariantSmartYes

Built-in, externally readable MID meter (4Business 710 and 730), but per Mennekes MID-compliant only on a three-phase connection. Check that your charger is connected three-phase; in doubt, ask your installer.

The MID marking

On the kWh meter or its type plate, right after the CE marking, look for a capital M with the last two digits of the year in which the marking was affixed, together inside a rectangle, followed by the identification number of the notified body. That is the supplementary metrology marking the European Measuring Instruments Directive (MID, 2014/32/EU) prescribes.

Example of a type plate with the CE marking and the MID markingNext to the CE marking stands a rectangle with an M and the last two digits of the year, followed by the number of the notified body.Example type plateCE260000MetrologymarkingM26 = MID marking
Charging power
22 kW
Phases
single- or three-phase
Connector
tethered cable or type 2 socket
Connectivity
Wi-Fi, Ethernet
OCPP
1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
businesses
Availability
in the current range
Mennekes Amtron 4Business 600

Amtron 4Business 600

MIDVariantSmartYes

Built-in, externally readable MID meter (4Business 610 and 630), but per Mennekes MID-compliant only on a three-phase connection. Check that your charger is connected three-phase; in doubt, ask your installer.

The MID marking

On the kWh meter or its type plate, right after the CE marking, look for a capital M with the last two digits of the year in which the marking was affixed, together inside a rectangle, followed by the identification number of the notified body. That is the supplementary metrology marking the European Measuring Instruments Directive (MID, 2014/32/EU) prescribes.

Example of a type plate with the CE marking and the MID markingNext to the CE marking stands a rectangle with an M and the last two digits of the year, followed by the number of the notified body.Example type plateCE260000MetrologymarkingM26 = MID marking
Charging power
22 kW
Phases
single- or three-phase
Connector
tethered cable or type 2 socket
Connectivity
Wi-Fi, Ethernet
OCPP
1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
businesses
Availability
in the current range
Mennekes Amtron Charge Control

Amtron Charge Control

MIDVariantSmartYes

Has a calibrated, externally readable meter, but Mennekes states it is MID-compliant only on a three-phase connection. If the wallbox is connected single-phase, the reading does not count as MID. In doubt? Ask your installer how it is connected.

The MID marking

On the kWh meter or its type plate, right after the CE marking, look for a capital M with the last two digits of the year in which the marking was affixed, together inside a rectangle, followed by the identification number of the notified body. That is the supplementary metrology marking the European Measuring Instruments Directive (MID, 2014/32/EU) prescribes.

Example of a type plate with the CE marking and the MID markingNext to the CE marking stands a rectangle with an M and the last two digits of the year, followed by the number of the notified body.Example type plateCE260000MetrologymarkingM26 = MID marking
Charging power
11 kW
Phases
single- or three-phase
Connector
tethered cable
Connectivity
Ethernet
OCPP
1.5, 1.6
Load balancing
dynamic
Solar charging
yes
Charge card (RFID)
yes
Intended for
home
Availability
in the current range

Amtron Xtra / Premium C2

MIDVariantSmartYes

Per the Mennekes datasheets the Xtra 22 C2 (1344202) and Premium 22 C2 (1345202) have an externally readable calibrated meter (MID-compliant); for the EU versions (Xtra E/R, Premium E/R/W) MID is not documented. Look through the window for a MID marking (M and EN 50470-3) on the meter, or ask your installer.

The MID marking

On the kWh meter or its type plate, right after the CE marking, look for a capital M with the last two digits of the year in which the marking was affixed, together inside a rectangle, followed by the identification number of the notified body. That is the supplementary metrology marking the European Measuring Instruments Directive (MID, 2014/32/EU) prescribes.

Example of a type plate with the CE marking and the MID markingNext to the CE marking stands a rectangle with an M and the last two digits of the year, followed by the number of the notified body.Example type plateCE260000MetrologymarkingM26 = MID marking
Charging power
22 kW
Phases
single- or three-phase
Connector
tethered cable
Connectivity
Wi-Fi, Ethernet
Intended for
home, businesses
Availability
discontinued

Amtron Start E / Standard E

MIDNoSmartNo

EU versions of the older AMTRON Start and Standard, without an energy meter — not ERE-eligible. In the same series only the Basic E and Basic R have a calibrated meter.

Check your own charge point

Not sure which model you have, or does it depend on the version? The MID check takes you through it in a few steps.

Go to the MID check

Compare ERE providers

Does your charge point have a built-in MID meter? Then an ERE provider can pay you for every kWh you charge. Compare what the providers pay.

Go to the comparison

No charger yet? Request a quote

Looking for a charger with a built-in MID meter? Fill in the form. We can pass your request on to Laadpaaldirect, who can contact you about a no-obligation quote.

Request a quote

This check is informational and based on public manufacturer specifications. To be sure, look for the MID marking on the meter or the type plate, or ask your booking service provider.

Is something wrong, or is your model missing? Let us know

The images on this page come from Mennekes.